| First epoxy coated strand job for dam contruction in the USInstallation of Flo-Bond epoxy coated strand anchors at the Steward Mountain DamThe double curvature thin arch concrete structure was built in the 1920's and is approximately 64 m high. Retrofitting became necessary to prevent a possible failure of the arch section, in which a separation along the joints during a major seismic event would occur. |

